  • AI data centers in 2026 require 100–750 MW per site, driven by continuous inference workloads and high-density GPU racks like NVIDIA's Blackwell, which draws 120–140 kW per rack.
  • Power strategies include grid power (facing 4–7-year waits in hubs), small modular reactors (SMRs) for long-term baseload, on-site natural gas for fast deployment, and renewables with storage for low-carbon compliance.
  • Cooling must shift to direct liquid cooling (DLC) for Blackwell densities, with optimization focusing on tokens per watt rather than traditional PUE for true efficiency.
  • A layered power stack (generation, transmission, facility, compute, inference) helps identify bottlenecks, with inference workload optimization offering major efficiency gains.
  • Microsoft's case study shows liquid cooling reduces energy overhead by up to 30% while increasing density, using a mixed power portfolio (grid, renewables, nuclear).
  • Key constraints are infrastructure limits: legacy facilities can't support high-density racks, and grid access delays or regulatory risks hinder scaling.