  • The author moved from the Bay Area to the East Coast to build a high-performance home due to land constraints.
  • Finding suitable land was challenging, requiring extensive outreach to potential sellers.
  • The author faced difficulties with architects and builders, including delays and miscommunications.
  • Superior Walls were used for the foundation, but issues arose with insulation and design.
  • Double stud walls were chosen for better insulation and thermal break elimination.
  • Pella windows were installed but later criticized for poor soundproofing and lack of features like tilt-turn.
  • HVAC installation had issues, including incorrect duct placement and delayed equipment setup.
  • Plumbing problems included incorrect pipe materials and installation errors.
  • Electrical work was mostly solid, but delays occurred due to builder mismanagement.
  • Insulation was a major issue, with poor installation techniques and inadequate coverage.
  • Siding installation faced delays, leading to WRB expiration and rework.
  • Drywall and flooring installations were problematic, with misalignments and poor finishes.
  • The builder's incompetence led to numerous issues, including deck and grading problems.
  • Technology integration included Zigbee for home automation and solar panels with a hybrid inverter.
  • Post-construction, the author reflected on lessons learned, emphasizing the importance of hiring elite builders and detailed contracts.