- The author moved from the Bay Area to the East Coast to build a high-performance home due to land constraints.
- Finding suitable land was challenging, requiring extensive outreach to potential sellers.
- The author faced difficulties with architects and builders, including delays and miscommunications.
- Superior Walls were used for the foundation, but issues arose with insulation and design.
- Double stud walls were chosen for better insulation and thermal break elimination.
- Pella windows were installed but later criticized for poor soundproofing and lack of features like tilt-turn.
- HVAC installation had issues, including incorrect duct placement and delayed equipment setup.
- Plumbing problems included incorrect pipe materials and installation errors.
- Electrical work was mostly solid, but delays occurred due to builder mismanagement.
- Insulation was a major issue, with poor installation techniques and inadequate coverage.
- Siding installation faced delays, leading to WRB expiration and rework.
- Drywall and flooring installations were problematic, with misalignments and poor finishes.
- The builder's incompetence led to numerous issues, including deck and grading problems.
- Technology integration included Zigbee for home automation and solar panels with a hybrid inverter.
- Post-construction, the author reflected on lessons learned, emphasizing the importance of hiring elite builders and detailed contracts.